Details: name of work:rrt work for package-5 (vz 15) of rangit-iv he project, sikkipclearing jungle including uprooting of rank vegetation, grass, brushwood,trees and saplings of girth upto 30cm measured at a height of 1m above ground level and removal of upto a distance of 50 m outside the periphery of the area cleared.excavation work by mechanical means (hydraulic excavator)/ manual means in foundation trenches or drains exceeding 30cm depth, 1.5 m in width or 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50mproviding and laying plum concrete in 1:2:4 c.c. (1cement, 2coarse sand, 4clean hard graded stone chips of 20 mm down nominal gauge) with 70% clean hard stone of sizes not exceeding 15cm including shuttering, compacting and curing complete, as per the direction of engineer in charge.providing and laying in position cement concrete of spec
Sector: Generation