Details: "repair of old damaged hot & cold pipe description of itemdismantling wall tile work in toilets laid in cement mortar including stacking material within 50 meters lead including entire carriage of materials within all leads, lifts, height and cost of all other incidentals.for thickness of tiles 10 mm to 25 mm.dismantling g.i. pipes (external work) including excavation and refilling trenches after taking out the pipes, manually by mechanical means. including stacking of pipes within 50 meters lead. as per direction of engineer-in-charge. 15 mm to 40 mm nominal bore.12 mm cement plaster on the rough side of single 72 or half brick wall of cement mortar 1:6providing and fixing chlorinated polyvinyl chloride (cpvc) pipes, having thermal stability for hot & coldwater supply and all cpvc plain. & brass threaded fittings, including fixing the pipe with ss clamps at 1.00 m spacing. this includes jointing of pipes & fittings with one. step cpvc solvent cement and testing of joints complete
Sector: Science University