Details: earthwork in excavation for structures as per drawing and technical specification clause 305.1 including setting out, consolidation of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 mtrs., dressing of sides and bottom and backfilling in trenches with excavated suitable material. -upto 3.00 mtrs. depth. providing and laying mechanically mixed and vibrated plain cement concrete in open foundation for all type of structure complete of plain concrete nominal mix 1:3:6 (one cement isto three sand isto six graded stone agreegate. including hauling / carriage of all labour equipments and materials to various locations through all modes of transporations in all leads and lifts to the entire satisfaction as per direction of engineer-in-charge providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and size towards the wall and provid
Sector: PWD