Details: p/f air blower with alide accessories as per all respect up to the setisfaction of the engineer in charge. design supply and instalation of the aeration grid including deffusers and connecting the same with the existing grid and existing blowers complete in all respect up to the satisfaction of the engineer in charge. p/f submersible pump 10hp air blower with alide accessories as per all respect up to the satisfaction of the engineer in charge. excavation in foundation trenches(for pipes & pits) upto all depths in all class fication of earth work such as pick work, jumper work, saturated soil including bailling and pumping out water, blasting soft/hard rock or chieselling soft/hard rock where blasting is protibited in all lifts including trimming and dressing of sides, leveling of beds to correct grade i/c shoring/strutting, planking,timbering & dewatering wherever required, stacking the useable & unuseable material/soil separately & after laying jointing & testing of pipes, returning
Sector: Medical and Health