Details: providing and applying primer coat of low porosity with bitumen emulsion (ss-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.85 kg.(point eight five kilogramme ) per square meter using mechanical means as per technical specification clause 502 (five hundred two) upto entire satisfaction & direction of engineer-in-charge, including carriage of all labour, equipments and materials to various locations through all modes of transportation in all lead & lift and other incidental charges. providing and applying tack coat with rapid setting (rs-1) bitumen emulsion using emulsion distributor at the rate of 0.275 kg (point two seven five kilogramme) per square meter on the prepared dry and hungry grannular bituminous surface treated with primer cleaned with hydraulic broom as per technical specification clause 503 (five zero three) and as per direction of engineer in charge including carriage of all labour, equipments and materia
Sector: PWD