Details: " part ht":- mannual carrige of 0.95 km ht line material on steel tubular pole from road head to site of work considering average lead 0.8 km. (0.95*0.8 = 0.76 km ) complete in all respects as directed by engineer-in-charge including all types of lead lift and other incidental etc. of steel tubular pole 9 mtrs.long.(tapping / double pole str.):- digging of pit , drilling of holes in x-bracing set,x-arm , of pole ,
Sector: Distribution