Details: 300. excavation for structuresa) without dewatering.earthwork in excavation for structures as pe rdrawing and mord technical specifications clause 305.1 including setting out, construction of shoring & bracing, removal of stumps & other deleterious material and disposal upto a lead of 50m, dressing of sides & bottom and back filling in trenches with excavated suitable material.i. ordinary soil(i) upto 3.00 mtr depth filling in foundation trenches as per drawing & mord technical specification clause 305.3.9, 1200.(i)sand filling providing concrete forplain/reinforced concreteinopen foundations complete including form work as per drawings & mord technical specifications clauses 802, 803, 900,1202 and1203. (including centering, shuttering, staging etc. but excluding reinforcement). p.c.c grade m 10 (i) nominal mix 1:3:6 plastering with cement mortar (1:4) 12 mm thick on brick work /c.c. work including a finishing coat of neat cement punning with 2.75 kg of cement per sqm in substructure
Sector: Water supply and Sewerage