Details: dismantling and removing r.c.c.columns beams slab staircaseanding lintels including stacking the useful materials for reuse and removing the debris within 50m lead. providing, fitting and fixing of seal joint as per approved drawing and technical specification as per section 2600 of morth specificatios for road and bridge etc complete. providing and applying epoxy bonding coat between old and new concrete incluidng cost all materials, labour, conveyance & t&p etc. complete in all respects as per specification & direction of the engineer-in-charge. supplying, cutting, bending, binding the hysd bar from (sail/rinl /tiscon) and tying the grills and placing in position including cost, conveyance, taxes of all materials and cost of all labour (t&p) etc. complete. providing and laying cement concrete wearing course rcc m30 grade complete as per drawing and technical specifications. providing and laying cement concrete (1:1.5:3) with 12mm size crusher broken hard granite c
Sector: RDPR