Details: earth work in excavation of foundation trenches in hard soil including dressing of sides and levelling the bed up to the required depth and depositing the excavated materials away from the work site within 50m initial lead & 1.5m initial lift. complete as directed by the e.i.c.(as per ar page no.-1, item no.-1) supplying & filling of foundation with course sand well watered and rammed including cost, cost of all labour, carriage, royalty complete in all respect. (as per a/r page no-1, item no-2) cement concrete of proportion (1:3:6) in foundation using 4cm (1 ½”) size clean hard black crusher broken granite stone metal of approved quality and from approved quarry including hoisting, lowering and laying concrete in layers not exceeding 15 cm. (6”) thick to the required level ramming, watering, curing etc. complete including cost, conveyance, royalties & taxes of all materials with all labour, cess & t&p required for the work etc. complete in all respect. plain cement concrete (1:2:4)
Sector: PWD