Details: e-type quarterearth work in excavation in foundation in all kinds of soil with in 50m initial lead and1.50m initial lift including rough dressing and breaking clods to maximum5cm to 7cm in size and laying in layers not exceeding 0.30min depth and as per the direction of eic. supplying all labour t&p materials and refilling the trench with selected sand including watering and ramming including transportation charges and royalities alll comlete as per the direction of eic. supplying all materials, labour, t&p and providing c.c.(1:3:6) with 4cm size hg metal including cost carriage royalty of all materials etc all complete. supplying all materials, labour, t&p and providing cement concrete(1:1.5:3) with 12 mm size hg chips for rcc work including hoisting lowering & laying &cost carriage royalty of all materials etc all complete. supplying all materials, labour t&p and placing uncoated hysd bar reinforcement including cost, conveyance, royalty etc all lead and royalty etc all complete
Sector: Water supply and Sewerage