Details: clearing grass and removal of up to a distance of 50 metres outside the periphery of the area as per direction of the engineer-in-charge flank dressing to proper camber with all taxes , labour including hire and running charges of machinaries t&p required for the work including cess as per the specification and direction of engineer-in-charge. providing,scraping & cleaning the road surface for 37.50 mm thick busg applying tack coat using 3.0 kg. of bitumen for 10 sqm and laying 37.50mm thick built up spray grouting in one layer using 0.45 of 25mm to 40mm size hard granite metal and 12.00 kg grade of bitumen(60/70) for 10 sqm with 0.12 of 12mm size hard granite chips as key stone for 10 sqm spreading over and laying including heating pouring and spreading over and spreading bitumen metal and chips and rolling with prr including hire and running charges of prr and all other machineries and including cost and conveyance bitumen, metal and chips with all labour, t & p & c
Sector: RDPR