Details: clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per technical specification clause 201 of mord specification for rural roads and as per the direction of the engineer-in-charge. construction of embankment with approved material obtained from borrow pits with all lifts and leads , transporting to site by mechanical means within a lead of 5 kms spreading , grading to required and compacting to meet requirment of table 300-2 & clause 305 of mosrt&h specification for road & bridges work labour for scarping cleaning the road surface applying tack coat using 3.00 kg of bitumen for 10 sqm and laying 37.5 mm thick built-up spray grouting in one layer using
Sector: RDPR