Details: excavation of any approved type of soil in approved borrow area by mechanical means loadinfg into and transportation by mechanical means and unloading the soil within a lead of 5.00 km on properly prepared surface including spreading and levelling the earth in 22.50 cm layers in embankment with all leads, lifts, & delifts including royalty of earth all labour charges, t&p, hire and running charges of transport vehicle, b&o.c, workers welfare cess etc. complete as directed by the engineer-in-charge.
Sector: Irrigation