Details: supplying and application of dust stop copolymer of approved quality, make (sscc801) for road dust suppression including cost of all materials, labour for application, transportation t & p etc and other necessary requirements to bind the soil surface and control the dust pollution as per direction of eic to complete the work in all respect for cuttack baliyatra 2024 (total 10 days) supplying and watering of road surface by tractor mounted water tanker with sprinkling arrangement including cost of all materials, labour for watering, transporation, t&p etc and other necessary requirements to make the road surface and control the dust pollution as per direction of engineer-in-charge to complete the work in all respect for ensuing cuttack baliyatra 2024 from15.11.2024 to 24.11.2024 and extended period if required
Sector: Municipality