Details: earth work excavation in foundation in hard soil with 50 mtr initial lead 1.5 m initial lift including rough dressing and breaking clods to 2 cm to 7 cm and laying in layers not exceeding 0.3 m in depth as per direction of engineer-in-charge filling foundation and plinth with sand watered and rammed as per direction of engineer-in-charge. cement concrete ( 1:4:8) with 4 cm size h.g metal as per direction of engineer-in-charge. cement concrete ( 1:2:4) with 12 mm size h.g chips as per direction of engineer-in-charge. rigid and smooth centering and shuttering for rcc work including false work and dismentalling them after casting including cost of materials complete in column beams,roof slab,plinth bend supplying, fitting and placing oncoated hysd(tiscon) bar reinforcement complete as per drawing and technical specification including cutting , binding , bending and cost of binding wire. brick work with c.b. brick 25cm x 12cm x 8cm size having crushing strength not less than 75kg / c
Sector: Irrigation