Details: excavating in post holes (or similar holes) each not exceeding 0.5 , getting out, returning, filling in and ramming earth or broken rubble mixed with earth around, in layers not exceeding 25cm, watering, and removing surplus soil to a distance n exc 50m and making good surfaces in soft/loose soil complete all as specified & as directed. material and labour for plain cement concrete 1:2:4 type b2, (using 40 mm grade stone aggregate) as in foundation, filling and mass concrete etc. complete all as specified and as directed. note: every fifth post, corner post & end post with stareet only be embeded in pcc. dismantling posts or struts embedded in ground (steel) any section, including taking out embedded portion in natural ground/concrete and making good disturbed ground complete all as specified and as directed. dismantling fencing wire mesh of any size and type complete all as specified and as directed. supply only chain link fencing wire mesh of size 100x100mm, made with 4mm dia
Sector: Defense