Details: revisioning and testing of valves installation of flanged / rtj valves/ level troll/ fire hydrant/ monitors/ safety valves etc. transportation of all types of flanged / rtj valves, level troll, fire hydrant, monitor, gaskets, nut bolts etc. either from owner's storage point to workshop and/ or worksite. installation at ground level i.e. up to a height of 5 meters on sleepers, pipe racks etc. or up to 5 meters depth in trenches including assembly of valve accessories, cleaning of flanged faces, lapping of rtj rings, providing new gasket (iocl supplied) or cutting of new gaskets to proper size if required, placing the gaskets / rtj ring properly, installation in position with correct direction, tightening of studs, providing earthing protection by way of fixing strips, complete the job in all respect as per drawings and direction of the engineer-in-charge, including all labour, tools, tackles, consumables and supervision etc. and tightening of the gland to ensure zero leak including
Sector: Custom1