Details: oxygen systemsupply, installation(sitc) of fully automatic trisource oxygen control panel. itshould fully complies and meets with htm02-01, c 11 standard and duly ce marked. sitc of medical grade copper pipe with required copper fittings & supports as per en13348 28mm outer dia, 0.9mm thick 22mm outer dia, 0.9mm thickdigital area line pressure alarm it should fully complies and meets with htm02-01, c 11 standard and duly ce marked. 1 -2 gas services digital alarm ce markedcomplete design, installation, commissioning and functionality check of lmo system, mgps system, interoperability and gasification. lmo equipment manufacturer and medical gas inspector should be at site to audit, approve & certify the installations supply, installation, testing and commissioning of shut off valves it should fullycomply and meetswith htm02-01, c 11 standard and duly ce marked along with 4-digit code. iso & ce certified. 22mm28mm42mm lmo sys
Sector: Labour and Employment