Details: earth work in excavation -do- -do- all complete job as per specification & direction of e/i. construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at omc, and compacting with smooth wheel roller to achieve the desired density, complete as per technical specification clause 401.with grading-iii material providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level : 1:1½:3 (1 cement: 1½ coarse sand (zone-iii) : 3 graded stone aggregate 20 mm nominal size) centering and shuttering including strutting, propping etc. and removal of form work for : foundations, footings, bases for columns etc. for mass concrete. earth work in filling -do- -do- all complete job as per specification & direction of e/i. earth work in excavation of foundation of structures as per drawing and technical
Sector: RDPR