Details: (1) pcc roadlabour required for site clearence, cutting levelling and dressing all comp earthwork in excavation in foundation trenches in ordinary soil (vide classification of soil item-a) and disposal of excavated earth as obtained to a distance up to 50 m including all lifts levelling ramming the foundation trenches removing roots of trees shrubs all complete as per approved design, building specification and direction of e/i. providing coarse clean sand in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150 mm thick with all leads and lifts . all complete as per building specification and direction of e/i (mode of measurement compacted volume) providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering m10(1:3:6) all complete as per specification and direction of engineer-in-charge providing and laying in position cement concrete
Sector: Zilla Parishad