Details: earthwork in excavation in foundation trenches in ordinary soil (vide classification of soil item - a0 and disposal of excavated earth as obtained to a distance upto 50m including all lifts levelling, ramming the foundation trenches, removing roots of trees, shurbs all complete as per approved design, building specification and direction of e/i. extra for earth work in hard soil as per specification and direction of e/i. (vide classfication of soil item - b) earth filling in foundation trenches and plinth in layers not exceeding 150 mm. thick well watered, rammed, fully compacted and fine dressed with earth obtained from excavation of foundation frenches within a lead of 50 m. and lift of 1.5 m all complete as per building specification and direction of e/l (mode of measurement compacted volume). providing coarse clean sand in filling in foundation trenches or plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts includng cost of all materia
Sector: Buildings