Details: supply installation testing and commissioning of 11/0.433kv, 3-phase 100kva distribution transformers with bimetallic terminal connectors energy level-2, and with lv cable box having detachable al gland plate. transformer should have arrangement for vertical take off. supply installation testing and commissioning of 9 mtr. long pole (st-410 sp33). supply installation testing and commissioning of 8 mtr. long pole (st-410 sp15). supply installation testing and commissioning of g.i. channel x-arms (100x50x6)mm 8ft long 2no's alongwith braces supply installation testing and commissioning of g.i. channel x-arms (75x40x6)mm 8ft long 7no's alongwith braces supply installation testing and commissioning of g.i. angle belt (50x50x6)mm, 9ft long 2no alongwith braces supply installation testing and commissioning of g.i channel v-cross arm (75x40x6) mm 5.5ft. long 9no's alongwith f-top & back clamps (1.5 / kg). supply installation testing and commissioning of 0.05acsr conductor supply insta
Sector: Power Sector