Description: Supply Installation Testing and Commissioning of Equipment s required for Construction of 10MVA 33/11KV Receiving Station at Redwani under Capex Budget.
Details: 9 Mtr. Long Pole(PCC WL-300Kg , ST-410 SP33)11 Mtr. Long Pole(PCC WL-360Kg, ST-410 SP56)GI V cross-arm(75x40x6)mm with top Bracket including clamp as per RECGI Channel X-arm, F Top,Belts including clamps and braces as per REC50 mm² ACSR ConductorPG Clamps for 50 mm² ACSR Conductor11kV Polymeric composite Pin Insulator 12kV, 5kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320 mm11kV Polymeric composite Disc Insulator 12kV,min failing load45kN, Lighting Impulse 75kV Positive and 80kV Negative,creepage distance 320mmGalvanized Nuts and BoltsDanger Plates with ClampsAnti-Climbing Device with ClampsEarthing Complete by GI Pipe 40 mm or GI Rod 20mm 2.5 mtr long through GI StripProviding & painting of to 9Mt Long S.T poles with one coat of Red oxide paint & Two Coats of Almunium Paint (ISI mark)Cement bottoming of S T Poles in 1:2:4 mix as per REC standards 0.5 Cum /pole as per RECGalvanised Stay Set with 50x8mm stay clamp, guy insulator(2Nos.), anchor plate (200x 2
Sector: Power Sector