Description: HARIPARBAT SUB DIVISION RRHP1
Details: Name of Work:Snow clearance (zone-wise) of areas falling within the jurisdiction of (R&B) RRCR Divn. Sgr. (Details of roads given in Annexures of Fresh NIT No. 59) (RRHP1) Clearing snow (with frost) from roads, manually using picks and shovels; snow depth upto 150mmClearing snow (without frost) from roads, manually; Snow depth upto 150mmSnow depth over 150mm but upto 250mm."Snow depth over 250mm but upto 350mm. "Snow depth over 350mm but upto 450mm. Snow depth over 450mm but upto 550mm. Snow depth over 550mm but upto 650mm. Snow depth over 650mm but upto 750mm. Snow depth over 750mm but upto 850mm. Snow depth over 850mm but upto 950mm. Gulla cutting in compressed snow 150mm deep and 4 mtr wide1200mm deep and 4 mtr wide
Sector: PWD