Details: provision for sign board writing earth work in bulk excavation by manual means over area (exceeding 30cm in depth 1.5m as well as 10m^2 on plan ) including disposal of excavated earth lead upto 50m and lift upto 1.5m.--------- neatly dressed in a.k.o.s. earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres:all kinds of soil providing and lying in position cement concrete 1 cement:5fine sand:10 graded crushed stone aggregates 40mm size.excludingthe cost of centring and shuttering all work upto plinth level,including all lead and lifts. providing and laying in position cement concrete 1 cement:3 fine sand:6 graded crushed stone aggregates 20mm size exclud
Sector: RDPR