Details: earthwork in bulk excavation by manual means in trenches for foundations, drains, pipes, cable etc. (not exceeding 1.5 in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, depth upto 1.5 mtr including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth is to be levelled and neatly dressed in aks providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. all work upto plinth level with: 1:5:10(1 cement :5 coarse sand : 10 graded stone aggregate 20 mm nominal size) providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. all work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) p/l i-shaped interlocking tiles of size 50mm form work of ordinary timber planks all complete job carriage of sand bajree by 25km by mt carriage of cemen
Sector: RDPR