Details: earth work in bulk excavation by mechanical means (hydraulic excavator) in exceeding 10 sqm on plan, in 70% aks and 30% or. providing and laying hand packed stone soling filling of available excavated earth excluding rocks providing and laying in position cement concrete of m5 grade including curing but excluding the cost of centring and shuttering. all work upto plinth level. providing and laying in position cement concrete of m10 grade with 30% boulders including curing but excluding the cost of centring and shuttering. all work upto plinth level supply of stones in plum concrete centering and shuttering including strutting, propping etc. and removal of form work carriage of sand /aggragates by 15 km mt carriages of earth by 3kmmt carriages of stones by 400m hl installation of cib
Sector: RDPR