Details: earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: 2.8.1 all kinds of soil : 1 meter fromcutting edge disposal of excavated eath for an avg lead of 100mts (to be paid as per actual) dry random rubble masonry with hard stone in foundation and plinth:7.3.2 without bond stone including all leads and lifts random rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 cement : 6 coarsesand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with:7.1.1 cement mortar 1:6 (1 cement : 6 coarse sand) including all leads and lifts providing & laying of stone solling hand packed including carriage 5km by mt
Sector: RDPR