Details: earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: a) all kinds of soil. supplying and laying of dry stone soling hand packed tightly including ramming, watering and filling of interstices including all carriages complete. providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. all work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) complete all inclusive. centering and shuttering including strutting, propping etc. and removal of form for: retaining walls, return walls, walls (any thickness) including attached p
Sector: RDPR