Details: name of work:- snow clearance for the year 2024-25 of r&b division gurez for various helipads/bridges/rest house stage ist as per nit item description2"clearance by way of manual means for snowclearance of various helipads/ bridges/rest houses as per stage list) to a minimum width of 3.65 mtr keeping blade 5 cm above from the road surface for protection of the same from any damage including removal of residual snow by way of enagaging labours including providing side gapes at minimum length of 6 mtrs a@6 no per km (with/without frost) snow depth upto 150mm.p required complete incl. dewatering if any.(a) clearing snow ((with/without frost)) from helipads/bridges/rest houses, manually snow depth upto 150mm"(b) snow depth over 150mm but upto 250mm. (c)snow depth over 250mm but upto 350mm. (d) snow depth over 350mm but upto 450mm.(e) snow depth over 450mm but upto 550mm. (f) snow depth over 550mm but upto 650mm. (g) snow depth over 650mm but upto 750mm. (h) snow depth over 750mm
Sector: PWD