Details: earth work in excavation by manual means in trenches for foundation, drain, pipes, cables etc and for shafts, wells. cesspits and the like not exceeding 10 sqm on plan, depth upto 1.5 m inciuding disposal of excavated earth in: akos p/laying of cement conct. 1:5:10( 1 cement :5coarse sand :10 graded stone aggregates 40mm) of specified gradeincluding curing but excluding cost of centring and shuttring. all work up to plinth level. providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. all work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size). providing and laying 60mm thick factory made cement concrete interlocking paver block of m-30 grade made by block making machine with strong vibratory compaction and of approved size and design/shape laid in required colour and pattern over and including 50mm thick compacted bed of fine sand, filling the joints w
Sector: RDPR