Details: dismantling old protection work including cutting of crates and stacking of stones. dismantling expanded metal or i.r.c. fabrics with necessary battens and beading including stacking the serviceable material within 50 meters lead. earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by engineer-in-charge all kinds of soil : providing and laying dry nallah soiling tighly hand packed i/c carriage and headload charges complete providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. all work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) supply and filling of rbm/nailah muck/gsb at site incld sorting spreading watering laying & conslding by 8-10 roller complete incl car