Details: name of work: <laying of rcc sewar pipe line at sugar mill karnal > item description2laying of rcc sewar pipe line at sugar mill karnalearth work in excavation by mechanical means (hydraulic excavator )/ manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sum on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m, including getting out the excavated soil (disposed earth to be levelled and neatly dressed) and then returning the soil as required in layers not exceeding 20 cm in depth including consolidating each deposited layer by ramming, watering etc. disposal of surplus excavated soil as directed, within a lead of 50 m. (in all kinds of soil) hsr-4.12.1"providing and laying cement concrete 1:4:8 mix (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) alround 100mm s.w./ pvc pipes including bed concrete as perdesign. hsr-6.1.5"350 mm dia400 mm dia600 mm dia"providing, laying and jointing glazed stoneware pipe