Details: earth work in excavation in foundations trenches etc. in all kinds of soil where pick-jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres. dag belling single kassi minimum complete in all respect excavation of soil using hyraulic excavator and hydraulic tractor trolly i/c cutting and loading in trolly and transporting to the embankment locations with all lifts and leads ((a)) disposal/carraige from 0 upto 450m compaction ((iii)) extra for rolling to specifications. dressing of earth work: new work or remodeling work. earth work for lip cutting for lining of irrigation channels inclusive of all allowances, lead and dressing: 0 to 1.5 m depth dressing side slopes and preparation of sub grade for lining. putting 1:3 (ce
Sector: Water Resource Department