Details: earth work in excavation in foundations trenches etc. in all kinds of soil where pick-jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres. cement concrete 1:5:10 with stone aggregate 40mm gauge mixing by manual means wrought iron & mild steel ladders, framed grills, gratings etc. with ends of bars riveted or molded forged framed window guards, barred iron doors stair case iron railing etc. including cost of boltsand nuts, screws, welding rod complete fixing in position providing and fixing ( ppgl) precoated painted galvalume sheet roofing (size, shape and pitch of corrugation as approved by engineer-in-charge) the end rib shall have anti cappillary groove and return leg. the steel sheet must be having yield strength of
Sector: Road development