Description: Chamrawa Block ke Samne Se Distlory Factory ke Samne tak Nale ka Nirman Karya Name of Work Chamrawa Block Ke Samne Se Distlory Factory ke samne tak Nale ka Nirman Karya
Details: Excavation in foundation in ordinary soil (loam, clay or sand) including lift upto 1.5 meters and lead upto 30 meters and including filling, watering and ramming of excavated earth into the trenches or into the space between the builiding and sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by Engineer-in-charge upto a distance of 30 meters from the foundation trenches (SI. No. 251) UPPWD SOR-2022 Laying and compacting dry O.B.B. 40 mm gyage in foundation in layers of not more than 15 cm. Thickness including local sand, in ration 2.1 as per direction of the Engineer-in-Charge including cost of all materials labour T&P etc. required and including waterning & ramming for propoer completion of work SI. No. 3 New Item SOR 2022 R.C.C. work with cement approved coarse sand & 2 cms. Guage approved crushed stone grit in proportion of 1:1.5:3 in Raft foundation windows and sunshades excluding supply of reinforncement and its bending but inclu
Sector: Urban Authority