Details: providing, laying, spreading and compacting stone aggregated of 22.4-53mm gauge sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel 80-100 kn in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density as per (mord) technical specification clauses 405. providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at omc in mechanical mix plant carriage of mixed material by tipper to site, laying with 1% opc cement + 3.50% emulsion in uniform layers with paver in sub base/base coarse on well prepared surface and compacting with vibratory roller to achive the desired density. cement concrete pavement construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thic
Sector: PWD