Details: excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m. as per morth clause 301 (including cost of all matarial t&p, taxes, labour cess etc but excluding gst ) construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. as per morth clause 305 (including cost of all matarial t&p, royalty, taxes, labour cess etc but excluding gst ) construction of embankment with approved material obtained from borrow pits (lead 1km) with all lifts and leads, transporting to site, spreading, grading to required and compacting to meet requirement of table 300-2.as per morth clause 305 (including cost of all matarial t&p, royalty, taxe
Sector: PWD