Details: construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required and compacting to meet requirement of tables 300.1 and 300.2 with a lead upto 1000 m as per technical specification clause-301.5. providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kn in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 3 as per technical specification clause-405. construction of un-reinforced ,plain cement concrete pavement ,thickness as per design over a prepared sub base with 43 grade cement or any other type as per clause 1501.2.2 m-20 (grade ),coarse an using curing compound (where specified ) and water finishing to lines and g
Sector: RDPR