Details: part-a conctruction workearth work in cutting or in embankment in ordinary soil excavation to be in the form of a regular pits not exceeding 0.50m in depth and earth work in embankment to be in 20cm layers including ramming and dressing the surface to required levels and slopes and also including 1.5 m lift and 30m lead. the earth in form of cutting (b) to be used as spoil banks within 50m distance as directed by the engineer-in-charge. including all taxes but excluding gst earth work in embankment mechanically comacted to 95% ptoctor dencity in ordinery soil, excavation to be done of reguler pits notexceeding 0.5mtr. in depth and work in embankment to be in 20cm. lyer includingramming and dressing pulverization surfacing inculding supply of labour, t&p, roller and water sprinkler etc.(s.i. no- 253(a) including all taxes but excluding gst provinding, laying and spreading materila on a prepared surface, subgrade adding cement @ 2 per cent by weight to the spread material manually mix
Sector: PWD