Details: e/w in excavation in trenches for foundation pipe cable etc. in ordinary soil including lift upto 1.5m lead up to 50m and surplus excavated earth as directed by the engineer. providing & laying of base c.c. in 1:6:12 with 40 mm gauge brick ballast including all complete work. m-150 brick work in 1:4 cement and coarse sand mortar in plinth to superstructure including supply of all material, labour and t&p etc. required for proper completion work. r.c.c. work in 1:2:4 with 20mm stone grite. m.s. iron work in r.c.c. complete work including all. p.c.c. work in 1:2:4 with 20 mm stone grite. struck pointing 1:2 with cemet & coarse send including supply of all materials requried for completion of work. construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required and compacting to meet requirement of tables 300.1 and 300.2 with a lead upto 1000 m as per technical specification clause-301.5. laying br
Sector: RDPR