Details: clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per technical specification clause 201. by manual means providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadem specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100kn in stages to proper grade and camber, applying and brooming stone screening to fill up the interstices of coarse aggregate, watering and compacting to the required density grading-3 as per technical specification clause-405 providing and applying tack coat with bitumen vg-10 using bitument distributor at the rate of 0.30kg per sqm on the
Sector: PWD