Details: earth work in filling in ordinary soil (loam, clay or sand) including, lift up to 1.50 m and lead up to 30m and including filling watering and ramming of oxcavated the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer-in-charge up to a distance of 8km. form the foundation trenches including royalty@ 9.00 per . (chapter no.4 pwd.sch.-253(a)+ cptr no. 3 1 to 8 km.) providing and laying cement concrete in 1:5:10 (1 cement :5 fine sand 10 graded stone aggregate 40mm nominal size) and curing complete, including cost of form work in foundation and floors. (5-chapter pwd.si.-01) class-150 brick work in 1:4 cement and coarse sand, mortar in foundation and plinth including supply of all materials, labor and tools and plants, etc. required for proper completion of the work. ( chapte no. 06 s.i. no. 2) 12mm thick cement plaster in single coat of fair side of single of half brick wall for interior plastering u
Sector: RDPR