Details: internal section and service road/daula scraping cutting, filling upto 8 cm. of kauriya dy minor (from km. 0.00 to 8.70). including all lead, lift, manual compaction with leveling and dressing to profile as per id specification/ direction of engineer incharge with cost of all labour and t&p. silt clearance below the vrb upto 50 cm. including all lead, lift, manual compaction with leveling and dressing to profile as per id specification/ direction of engineer incharge with cost of all labour and t&p.
Sector: Irrigation