Details: dismantling of following type of road, stacking of serviceable disposasl of unserviviable from site of work.(upjn) a ) bituminos road concrete work on road excavation of trenches manually or machanically in soil mixed with moorum/shingle/ kanker for pipe line with lift up to 1.5 m lead up to 50 m including filling back, watering and ramming of excavated earth in to the trenches and removal and disposal of surplus earth a) in mixed soil -60% sand filing in plinght including supply of lab mat t&p etc all comp supply of following zize a) 110mm dia pvc pipe isi mark provinding special required for proper completion of work 10% of pipe cost carting of following size of pipe and specials from store to the site of work within 8kms, lowering the same into trenches and laying true to the alignment and gradient including jointing the same properly and testing of pipe line including cutting of pipe for the making the required lengths as per design ch
Sector: RDPR