Details: laying and jointing pvc pipe. heading earth work in embankment in ordinary soil excavation to be in the form of regular pits not exceeding 0.50 m in depth and earth work in embankment to be in 20 cm layers i/c ramming and dressing the surface to required levels and slopes and also i/c 1.50m lift and 30 m lead. the earth from cutting to be used in making embankment or to be deposited as per spoil banks with in 30 m distance as directed by the engineer incharge . complete in all respect as per sino. 253(a) 3 km cartage concrete with 4 cm gauge brick ballast, fine sand of 1.25 f.m and cement, in proportion of 12:6:1 in foundation and under the floors, i/c supply of all materials, labour , t & p etc. required for proper completion of the work. as per s.i. no. 273 m -150 brick work with in 1:4 (one cement & four corse sand) mortar in foundation and plinth including supply of all materials, labour , t & p etc. required for proper complet