Details: installation of additional 250 kva, 11/0.4kv t/f, replacement/additional ab cable laying inplace of jarjar/damaged ab cable, installation of 11 kv rmu and 11 kv feeder bifercation work and other system improvement works at various substations under eudc-i, prayagraj under business plan 2024-25 including loading, unloading & carriage of materials from store center naini to dump site and vice-versa. of 11 mtr. long stp double pole including fixing of all necessary clamps, other accessories like top channel, t/f base channel, pin insulator with pin etc. for 11/0.4 kv 250 kva t/f (required materials like clamps, nut & bolt, m.s. channel, base channel, m.s. bracing angle etc. as per site requirement will be arranged by the contractor.) of 9/11 mtr. long stp/pcc single pole. grouting and plinthing of 9/11 mtr. long stp/pcc pole. grouting in ratio 1:4:8, cement, stone grit & coarse sand, plinthing of support of size 0.4x0.45x0.3 mtr. with cement, coarse sand & brick blast in ratio 1:4:8
Sector: Distribution