Details: earth work in silt clearence of drain including lift upto 1.50m. and lead upto 6.00m. by hydraulic excavator/ jcb poclain machine. the earth from clearence to be used in side embankment or to be disposed off on spoil banks or as directed by engineer-in-charge.
Sector: Irrigation