Details: construction of embankment/patri with approved material obtained from borrow pits with all lifts (distance 10 km) and all leads, transporting to site, spreading, grading to required and compacting to meet requirement of table 300-2. (ref. to mort&h specification no.305) including cost of earth and royalty etc. concrete with 4 cm. gauge brick ballast, fine sand of 1.25 f.m. and cement, in proportion of 12:6:1 in foundations and under floors, including supply of all materials, labour, tools & plants etc. required for proper completion of the work as directed by the engineer in charge as per pwd si no 273 m-150 brick work in 1:4 (one cement & four fine sand of 1.25 fm) mortar in foundation and plinth including supply of all material labour, tools & plants etc required for proper completion of work as directed by the engineer in charge as per pwd (si no 305a) 12 cm thick plaster with 1:4 cement and fine sand of 1.25 fineness modulus over brick work minimum thickness not to be less tha
Sector: Urban Authority