Details: dewatering work by 10 hp diesel pump set with operator & p.o.l. (i lift) making diversion drain with o/soil up to 1.50 m. lift & 30m.lead i/all complet. (ii lift) making diversion drain with o/soil up to 1.50 m. to 1.80 m. lift & 30m. lead i/all complet. (i lift) earth work excavation in ordinary soil / kanker mixed hard soil i/c up to 1.50 m. lift and 30 m. lead (ii lift) earth work excavation in ordinary soil kanker mixed hard soil i/c up to 1.50 m. to 1.80 m lift and 30 m. lead removal of slush from nala bed before excavation s.soil up to 2.40 m. to 2.70 m lift and 30 m. lead earth work excavation in foundation in mar kabar ordinary & kanker mixed saturated soil crest, wing wall etc. beyond 1.50 lift and 30 m. lead p.c.c. work with 1:3:6 (cement,c/sand & 20-40 mm s/ballast i/all cost of material, labour etc. required for proper completion of work. r.c.r. stone masonary work in 1:4 (cement :c/sand) morter i/all the cost of material, labour etc. required for proper complition of the
Sector: Irrigation